Slab rehabilitation at a potash plant

INDUSTRY · GHOR EL SAFI, JORDAN

Replacement of a concrete slab beneath production equipment in a chemically demanding environment.

Project Slab rehabilitation at a potash plant
Photograph: IKK MateenBar

The project and its requirements

The elevated slab beneath centrifuges at the Jordanian plant was exposed to chemicals and repeated vibrations. Rehabilitation was intended to reduce maintenance and production shutdowns.

How the reinforcement was used

MateenBar™ was used for its chemical resistance and durability. Embedded dynamic sensors verified the performance of the new slab after installation.

Working on a similar project?

Tell us the required reinforcement, quantity and delivery date.

Source of the project and photographs: IKK MateenBar. A manufacturer reference, not a project delivered by FiberCore.