The project and its requirements
The 2016 earthquake damaged State Highway 1 and cut off the Kaikoura area. Repairs had to be rapid and resistant to the marine environment.
How the reinforcement was used
The precast blocks were reinforced with MateenBar™. Anchoring was supplemented with MateenDowel™ dowels and GFRP bolts.



