The project and its requirements
The substation approximately 70 kilometres from Nelson required reinforcement that would not interfere with sensitive electrical equipment.
How the reinforcement was used
MateenBar™ was used in the foundation slab. Its low weight also simplified transport of the material to the remote location.
