The project and its requirements
The structure in Ras Al-Khair is exposed to water, sand and an industrial environment. The design focused on service life and reduced maintenance.
How the reinforcement was used
The culvert used 16 mm MateenBar™ bars. The reinforcement resists corrosion and chemical exposure.



